Daniel Dizon

← Writings

Why church infrastructure needs a commitment device

Shared infrastructure for churches strains under venture, volunteer, denominational, private equity and public-market ownership. Why capital-market owners are structurally antithetical to it, and why a nonprofit that binds its own future is the stable equilibrium.

Daniel Dizon · 7 min read

“Except the Lord build the house, they labour in vain that build it”

Psalm 127:1

Churches and ministries share infrastructure problems none can solve alone: capturing a response safely, following up within the law, protecting children, and passing a person to a local church with their consent intact. Christ builds his Church, and no institutional form can guarantee that outcome. Shared infrastructure is a means, and it would plainly help. The open question is which institutional form can provide it without its incentives turning against the people it serves.

Five forms and where they strain

The venture-backed platform. Venture capital is priced on outsized growth, and churches have low, uneven willingness to pay, so the provider is pushed toward the monetisable edges: data, engagement, premium tiers, or a richer market. A well-intentioned founder cannot bind a future acquirer or the next round.

The volunteer open-source project. Open code removes lock-in, but maintenance is a public good, and public goods are under-provided. Projects serving low-revenue users flourish briefly and stall when founders move on.

The denominational system. Passing a person to the right next step is inherently cross-denominational, and a system owned by one tradition is a weak focal point for the others.

Private equity ownership and the publicly listed company strain for a deeper reason, and they deserve a longer treatment, because they are where successful church software tends to end up.

Why the usual forms strain Five institutional forms and where each strains: a venture platform faces low willingness to pay and is pushed toward data; a volunteer project cannot fund maintenance; a denominational system gives a cross-tradition problem to one tradition; private equity prices its exit on switching costs within a fund life; a listed company must grow quarterly from a captive base while its owners change daily. In the last two the residual claimant is not the Church. The alternative is a steward that removes its own future options. VentureplatformLow willingnessto pay pushestoward dataVolunteerprojectMaintenance isa public good;founders leaveDenominationalsystemOne traditionowns a cross-tradition problemPrivateequityFund life andexit price onswitching costsListedcompanyQuarterly growthfrom a captivebase, owners churnresidual claimant is not the ChurchA steward that removes its own future optionsnonprofit ownership, irrevocable licences, rules in code
Each common form strains for a structural reason.

Why capital-market ownership is antithetical

Both structures are efficient instruments for allocating capital to its highest risk-adjusted return. The problem is that shared church infrastructure is defined by properties a return-maximising owner is obliged to trade away.

Start with the objective function. A company’s directors owe their duties to the company and its shareholders, who are the residual claimants on its cash flows. Shared infrastructure for the Church has a different set of principals: congregations that cannot pay much, people whose most sensitive data passes through it, and a mission that is served by neutrality and low cost. When those interests conflict with enterprise value, the governance of a capital-market company resolves the conflict in one direction by design.

Private equity sharpens that conflict through time. A buyout fund typically has a life of around ten years and holds each asset for a few of them, financing part of the purchase with debt placed on the acquired business. Its return comes from a small set of levers: raise prices, cut costs, consolidate competitors, and sell to the next owner at a higher multiple. Prices rise on a captive base whose switching costs, accumulated data, trained volunteers and integrations, make leaving expensive. Support and maintenance are thinned. Fragmented tools are rolled up, which removes the alternatives that once disciplined pricing. The smallest churches, which generate the least revenue per seat, are either priced out or quietly deprioritised.

This is the hold-up problem in its textbook form. A tenant who has renovated a rented house at their own expense is in the same position: at renewal, the landlord can raise the rent by almost as much as it would cost to move and redo the work. Once a customer has made relationship-specific investments, the supplier can extract rent up to the cost of switching. A founder may never exercise that power. A fund underwriting a five-year return is structurally required to consider it, because the switching cost is precisely the asset it bought.

Public markets apply the same pressure continuously. A listed company is valued on expected growth, and a mature, captive market can only grow by raising revenue per customer or monetising adjacencies. Quarterly reporting compresses the planning horizon; share-based pay aligns staff with the share price; the market for corporate control means any board that declines to extract value can be replaced by one that will. Ownership is dispersed and changes daily, so there is no stable principal who can make a promise to churches and still be present to keep it.

The deepest problem is credibility. Any promise such an owner makes, never to sell participation data, never to raise prices on small churches, never to discontinue a free tier, is a promise that reduces enterprise value. In any sale, a buyer pays for future cash flows, and the option to break those promises is part of what is being bought. The commitment therefore has negative value to every future owner, which is why it is the first thing to be priced out. Under these structures time inconsistency is capitalised into the price.

The most valuable data such a system would hold is a record of people’s religious responses. To a nonprofit bound by the refusal described below, that data is a liability to be minimised. To a capital-market owner, it is an asset to be developed. The same database is a different object depending on who owns it, and that difference is the whole argument.

Extraction rises with each change of owner A line chart of rent extracted from churches over time. It starts low under a founder and rises at each sale, through a first fund, a second fund and a public market, approaching a ceiling set by the cost of switching away. A promise not to extract has negative value to each buyer, so it is priced out at each sale. ceiling: cost of switching awayFounderFundNext fundPublic marketsalesalesalerentextractedPromise not to extracthas negative value to a buyer
As ownership passes from founder to fund to public market, the pressure to extract rises toward the ceiling set by switching costs. Promises not to extract are priced out at each sale.

Binding the future

The concept that best explains the alternative is the commitment device: an arrangement by which a party deliberately removes options from its own future self, because the removal makes its promises believable to others. Ulysses tied to the mast is the classical image. In institutional design, a commitment device converts a statement of intent into a structural property.

Always Foundation, a US 501(c)(3) nonprofit building open infrastructure that helps ministries pass people to a local church with their consent, is constructed largely out of such devices.

It owns the code, the Always Pathway standard and the Always name outright, and it has no commercial arm. The platform is licensed under Apache 2.0 and the standard under CC BY 4.0, so anyone can run, fork or build on them, and a licence already granted cannot be withdrawn. If the foundation ever behaved badly, the exit would be cheap. That cheap exit is precisely what makes staying rational.

Its governance commits it never to fundraise from the people it serves, never to contact a ministry’s people except to pass them on, and never to pool ministries’ data. Commercial builders, including those linked to the foundation, hold no special rights.

Its most consequential commitment is a refusal. Architecture decision record 0013, accepted in November 2026, superseded an earlier design that would have linked one person’s responses across ministries using a keyed hash of a phone number. The foundation concluded that any capability to reconstruct religious activity across organisations would be a high-value target, open to misuse under future leadership, and would cut against a person’s freedom to change churches or leave without a persistent record. It rules the capability out “whatever the technique”. The reasoning is game-theoretic at its core: the only reliable way to guarantee that a capability will never be abused is for it not to exist.

Rules enforced in code

Commitments written in a governance document can still be ignored. The stronger form is a commitment the system cannot violate. The platform enforces several principles in code: consent travels with the person and every data movement checks it, failing closed; rules for minors run first and cannot be configured away; personal data is encrypted before it reaches the database; and every request runs under row-level security.

The design pattern is consistent: move protections from intention into structure, so they hold under turnover, pressure and changes of leadership. Unlike a company, a foundation that owns no equity cannot be sold, so there is no future buyer for whom breaking these commitments has value.

Four layers of commitment Four stacked layers, each harder to reverse than the one above: ownership and licensing that make exit cheap; governance commitments; architecture decisions such as ADR 0013 forbidding cross-organisation linkage; and controls enforced in code. Ownership and licenceNonprofit owns code, standard and name; Apache 2.0 and CC BY 4.0 make exit cheap.Governance commitmentsNo fundraising from people served, no pooled data, no special rights for builders.Architecture decisionsADR 0013: no cross-organisation linkage of people, whatever the technique.Controls enforced in codeConsent fails closed, minors rules first, row-level security, protected-path review.Harder to reverse
Each layer removes an option from the steward’s future self, and each is harder to reverse than the last.

The stable equilibrium

The test of an institution is what it does when its incentives are stressed. One that has removed its own options in advance passes that test more reliably than one that relies on character alone.

There is a theological dimension to this that is not decorative. The foundation’s own documents state that technology is a gift of common grace that can serve the gospel but never change a heart, and that Christ builds his Church. Psalm 127 makes the same point about every human institution: the builders’ labour is necessary and insufficient. Taken seriously, that conviction produces exactly the design described here. Building such a steward is slow and costly, and it asks founders to give up control they could have kept. It is worth doing. If the outcome does not finally depend on the builders, there is no reason for them to accumulate control, and every reason to build infrastructure that is free, shared and constrained against its own future misuse.